Termite Control Services
Unique Pest Control has developed an integrated Termite Treatment & Control Service to suit your specific needs.Unique Pest Control has a unique and exclusive technology for Termite control for your locality
The infested items should be identified and disposed of. Where possible the humidity of the infested area should be reduced by drying it out (if damp plaster is the main problem then a fan heater will have the desired effect). Insecticides can also be applied.
Damages Caused by Termites
Termites are never Sleep.Every year, They inflict more than 5 billion Dollar Worth Property damage according to the national pest management Association.Termite species have existed on earth for over 250 million years. The largest termite colony contained over three million termite.A termite queen can live 15 to 25 years and lay an egg every 15 seconds.One more thing, Termites damages not Covered in home insurance Also. Book a free Inspection Call Us: 9941916916
Termite Control Services We Provide
Unique Pest Control offers both pre-construction and post-construction anti-termite treatments to ensure your home and property are protected from destructive termite attacks. The chemical emulsion will be applied uniformly at below the prescribed rate in all the Stages of treatment. We are mainly using hand operators sprayer for the chemical Uniformity and also watering will be using the application of chemical emulsion.
Pre-Construction Termite Control Services
Stage – 1: (Bottom and sides of the trenches of Foundation)
The first stage i.e. Anti termite treatment to the foundation is carried out after the excavation of the trenches is complete. The bottom surface and the sides (up to a height of about 1 foot) should be treated with the chemical emulsion made chemicals listed above at recommended concentrations. Masonry foundations and basements should be treated with the chemical emulsion of the surface area.
Stage – 2: (Plinth Filling Treatment)
The top surface of the consolidated earth within plinth walls shall be treated with a chemical emulsion of the surface before the stone bed or sub-grade is laid.
Stage – 3: (External perimeter Treatment)
After the completion of the building, the soil along the external perimeter of the building should be Roding at intervals of 15 cm and to a depth of 30 cm. By the forward and backward movement of steel rod break up the soil and anti-termite chemical be poured along the wall of the vertical surface area. This forms a chemical barrier for termites in soil.
Post Construction Termite Control Services
Ground Floor – STAGE 1: Treatment to the wall and floor junction. Holes of 12 mm diameter 18-20 inches apart will be drilled along the inner junction of wall and floor at depth of 6’ on the entire foundation and 4” on the first floor premises. Termiticide solution will be injected under pressure into these holes to create a barrier against termites
STAGE 2: Treatment to termite tubes: Visible shelter mud rubes are first sprayed, to control the existing movement of termites. The mud tube will be then removed and treatment will be given to the infested area.
Outer area:
If there is loose earth around the walls of the building, Roding will be done on every ft. adjacent to the external surfaces of the foundation wall up to a depth of 500 mm from the ground level. If the building is surrounded by a garden, the treatment shall be carried out to soil, which is in immediate contact with the building.